Monday, September 15, 2008

Kim & I got some of the interior walls up today

The tin was still too wet to get up on the roof and finish the flashing and ridge cap so Kim (Campbell) and I began framing the interior walls (hopefully tomorrow we'll finish those two critical things). Additionally, we got the fascia up on the south side of the house (2" X 6"s nailed to the end of the trusses).
Here is a picture of the framing in the master bedroom (13' X 19')... entry to the master bath is on the right but the door is not framed yet (tomorrow):This is the kitchen with a little more framing left to be done (see pressure treated plate on the floor):
This is a view of the office from the living room... the hallway to the master bedroom is on the left (like in the kitchen there is 5 or so more feet of wall that has to be framed... see pressure treated plate on floor):And... this is the rear fascia with the soffit yet to be finished: