The weather was spectacular again today but David Musser, my helper, couldn't get here with his transit until 5:00. In spite of the late start we got the gravel leveled to grade and now we are waiting for the plumber to put the drains/water lines in the gravel. Once that gets done I'll roll out and tape my "foil-bubble-vinyl" vapor barrier/slab insulator and we'll be ready for the concrete finishers.

This picture is looking south down our 200' gravel driveway from St. Mary's Lane.

This picture is of David Musser standing in the master bedroom's walk-in closet and me standing in the doorway of the master bath-to-be.

This picture should be entitled "almost finished leveling the gravel."