Thursday, September 18, 2008
Hots on the left... cold's on the right...
Today I got most of the CPVC pipes (both cold and hot) run which includes measuring, cutting and fitting the pipes through holes that I drilled in the studs. I'm sure Howell (King), my plumber, will make some corrections to my work nevertheless I got most of the "rough in" piping finished today. Because I wanted Howell to check my work, I haven't glued the pipes together yet but that won't take long. Drilling the holes is a REAL pain but I borrowed a pipe cutter from Kim Campbell and that made that part of the job very easy. Here are a couple of pictures of my plumbing work:And the garden tub plumbing wall... ooops!... I forgot to include a supply line for the toilet... I'll do that tomorrow:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment