Thursday, November 26, 2009

Happy Thanksgiving

I promised Alexis that I'd get the living room and dining room ready for Thanksgiving so she could do her "homemaker" thing. I did and she did... she has really made the "very fine house" I built her a home. Here are a few shots of the dining room just before our Thanksgiving celebration:

My friend Roger Gertz's son-in-law works for Shaw Industries (carpet manufacturers) and he was able to get us some 2' X 2' commercial carpet squares (stacked in the lower left corner of this picture) and a brand new 10' X 10' bound piece of carpet which we used in the dining room. We like the look of the stained concrete but have been VERY disappointed in its durability... besides sealed concrete is so slick Baxter walks on it much like Bambi did on the ice... Big "B's" being marooned on a 5' X 7' piece of carpet is bumming out our VLD (VLD = Very Large Dog). The carpet squares are beautiful and will allow normal mobility for Big "B."
This was the center piece for Thanksgiving... pretty, huh!?
I get to be with Ethan & Baby Caleb in Tulsa a week from Sunday... EXCITING, huh!?... here's Ethan... he'll be 2 on December 3rd:
Here Caleb doing his best banana impersonation with his Daddy (Phillip Dail):As a point of interest... we are now drinking our rainwater (collected in these tanks):...and filtered through our "Big Berky":The rainwater gets poured into the left vessel (with the white ceramic filters/"candles" in view). The top vessel with the "questionable" water is stacked on the second stainless container (right) and the water leaches through the barely porous filters into the bottom container where we draw off the filtered rain water.

Sunday, November 1, 2009

More progress... inside

Well, we keep plugging and all the while Brigid's Wood feels more and more like home. Here are some shots of the living room and dining room:
And lest anyone should forget... the living room is over my left shoulder in the distance.

Saturday, October 24, 2009

Autumn in Tennessee at Brigid's Wood

This is a shot looking west on Highway 41A on our way home from Sewanee... Brigid's Wood is about a mile and a quarter from the "bustling" village of Sewanee... just ahead turn south on Sherwood Road (Highway 56):
About a mile down Sherwood Road (Highway 56) turn west onto St. Mary's Lane:
Count 4 telephone poles (about 800') and turn left into Brigid's Wood... if you don't turn, you'll end up at the late Sir John Templeton's empty library... not ONE book on the shelves of his multi-million dollar edifice:
Inside Alexis is making it a home:We heat primarily with our Tempwood wood stove (note: stained concrete floor):Mosby and Boone disappeared last night... ALL NIGHT. Alexis didn't sleep a wink worrying about our "little boys" (most dogs are "little" compared to our 120 pound "Big B"). Fortunately both Boone and Mosby were wearing "dog tags" (literally) and a lady who lives on Rattlesnake Springs Road left a message on our recorder, "My name is Dawn and I have two dogs here at my house who are sweeter than apple pie..." Rattlesnake Springs Road is over 3 miles from Brigid's Wood so it's a good bet Mose-bose and Boone-dog were lost. We brought them home and they crashed all day... here's Mosby on Baxter's bed:Here's Boone-dog sawing logs:Baxter was exhausted just thinking about their little juvenile delinquent caper:

Friday, July 31, 2009

Rainwater collection system installed

I was able to track down Aaron Gifford (my helper who is able to climb like a squirrel) this morning and we got our two "rain barrels" installed and hooked up. He also was able to significantly enlarge the dog pen and install a "thingie" on the bottom of both exterior doors that will keep mice from sneaking in under the door (Alexis is like most women... she doesn't like mice in her kitchen).
Now we have to wait for rain. Actually I couldn't find my PVC glue this afternoon so I'll have to wait until tomorrow to permanently hook-up the spigot at the bottom outlet. We'll begin to use the rainwater immediately to drink and cook (running it through our Big Berkey filter first).Last Monday my two local moving-guys - Sammy Dee (400#) and his "little" brother Fuzzy (only 350#) - came over and we got some of the really heavy things moved from the storage building into the house (these guys are good... I think that given a weekend they could pick this house up and move it over 6"). We are now at a point where we can begin to unpack and finally get settled instead of living out of a suitcase in a construction site (the living room/dining room are still not finished). Here is a shot of the bedroom with the basics in place on the newly stained floor (if you look closely, you can see I still need to touch up the corner between the "Orange Spice" and the "Vanilla Delight" and my homemade bed frame needs a skirt).One of the main things we got moved in was my Mama's book shelf which allows us to begin unpacking books of which there are MANY because Alexis is an ardent "paper & ink" book reader and historian. Emptying the storage building frees up room in there and lets us move tools and assorted "stuff" out of the house. Here's the bookshelf in the process of being filled (the shelves face the computer desk and the windows):And to vent politically I make these bumper stickers:

Friday, July 17, 2009

Learn as you go...

Before
Clean concrete after scrubbing with commercial buffer:During (Step #1... etching)
We had to re-etch the bedroom floor because I "forgot" to sufficiently scrub the floor with an "acid brush" after the acid solution had had a chance to "work" (is forgetting possible at my advanced age?... I can't remember?)... DUH!... I also wanted to get a REAL mop for the second time around to get the etching solution up off the floor... those little kitchen sponge mops just don't "hack it" for essentially a commercial job like this... and I was right ... the traditional "almost Navy swab" and the rented mop bucket with squeezer arm made the job of getting the etcher solution up a whole lot easier. By 10 PM, however, we were both wrung out like we'd been unmercifully squeezed through the mop bucket. Here are shots of the bedroom, hall and office beginning to dry after the etching:
Master bedroom:The hallway... for some reason the saw-cuts in the concrete took much longer to dry everywhere?:
Looking into office at and me, "two of the boys" and my incredible 24" iMac. ("I think... therefore iMac")... Baxter (Alpha Dog) and Boone-Dog are getting ready to do one of the things that they do best... sleep. If you look closely you can see Baxter shedding the equivalent of one and a half Beagles:During (Step #2... staining)
The stain has been applied here with touch-up needed before the application of the sealer :
Master bedroom (touch-up paint needed in corner between "Orange Spice" and "Vanilla Delight")... we wanted a leather-look on the floor and got it:Master bath needing touch-up before sealer:
Office looking at "barely pink" wall where large bookcase will go:

Saturday, July 4, 2009

The outside of our Irish cottage is finished



I also worked on laying leftover AAC blocks to create a pad for one of our two 1,600 gallon rainwater collection tanks. The second pad goes in tomorrow or the next day and then we can set the tanks, hook up the gutters to the system and start harvesting rain water. Here's the pad I finished today:
Alexis and her Mama did a lot of painting today so we're almost finished inside too.
So you'll understand how we are plumbing the rain water collection system, here is a rough diagram of the water flow:
Tomorrow we'll finish the little dab of painting that is left to be done on the inside and start cleaning the floors so they can be stained one room at a time... staining will be tough to do while we're living in the house.